December 2019

96NHS Working on a Pre Application for a new mixed use building in South London.

First stab at the street elevation includes Clamp Fired brickwork and steel lintels.

November 2019

79SH just received planning consent via an appeal process - good news about a project which has been long in the making for the improvement and extension of a 1970's block of flats

June 2019

69BR Some new pics as completion is near

November 2018

Some good fun modelling additions to an existing residential block, where the external structure benefits the residents by adding private balconies and lifts.

July 2018

69BR - The zinc roof has been installed and flood-tested

June 2018

69BR - The floor joists have been installed and the roof beam was craned into place.

April 2018

69BR - Ground floor timber and first floor steel structure and is in place, with the cantilevered corner showing on the left.

March 2018

69BR - Work has started on a new family home in Trumpington

November 2017

233QEW The front bay is nearly done and the roof extension and windows are in place.

September 2017

233QEW front bay is in place and roof works start

July 2017

First bricks up in 233QEW

June 2017

Piling rig at 54LP

December 2016

We are experimenting with copper sheets for the modelling of the roof shapes of a new project


November 2016

Soft strip and demolition work started on 54LP

October 2016

We have won planning consent for a new mixed use building in London. More about this project can be found here:

1BHT

July 2016

We have received planning consent to an extension and alteration of a semi detached house in Cambridge. More to come.